Gulf NewsConstruction Week MEFacilities Management Middle EastThe National UAEArabian BusinessKhaleej TimesGulf NewsConstruction Week MEFacilities Management Middle EastThe National UAEArabian BusinessKhaleej Times
Industrial technician in full cold-weather gear scraping compacted ice off an indoor slope rail at 2 AM, breath visible under fluorescent light
Issue No. 001 — Operations

The CompanyThat PlowsSnow in theDesert.

Clearance UAE · Est. 2019 · Dubai, UAE

Director's Statement
"

At 3 AM on a Friday, with 6,000 guests arriving in four hours, Clearance had the slope back to competition standard. I've never seen anything like it.

Mohammed Al Rashidi

Director of Facilities, Ski Dubai · Mall of the Emirates

24/7

Emergency Response

47+

Facilities Served

6hr

Max Response SLA

Case Study No. 001Routine Operations
Friday, 23:45 GST
001
The Problem

Slope ResurfacingSki Dubai

Compacted ice ridges 14cm deep across the main slope face. Structural load sensors flagging amber. Guest safety incident risk: critical. The slope opens in 7 hours.

Ice Accumulation Rate3.2 cm/hr
Structural Load Delta+18% above threshold
Downtime CostAED 145,000/hr
Affected Surface3,800 m²
Industrial plow clearing compacted ice on an indoor ski slope under fluorescent lighting at night
The Response

Four rotary plows deployed via the service corridor at 00:10. Chemical de-icer compound CR-7 applied in two passes. Thermal imaging confirmed uniform surface temperature at 02:55.

Equipment Deployed4× Rotary Plow P-Series
Crew9 technicians
Compound UsedCR-7 De-icer, 340L
Completion03:18 GST (3h 28m)
Thermal imaging scan showing uniform temperature distribution across a cleared ice surface
Thermal Scan — Post Clearance
03:28 hrs

Full slope cleared & certified

Case Study No. 002Emergency Response
Saturday, 03:12 GST
002
The Problem

Cold-Chain FailureJebel Ali Logistics Hub

Refrigeration unit failure in Zone 4C. Ice bridging across evaporator coils halted airflow. Sub-zero product inventory: AED 12M pharmaceutical stock at risk. Facility director on the phone.

Ambient Temp at Failure-22°C dropping
Ice Bridge Thickness31cm across 6 coils
Inventory at RiskAED 12,000,000
Compliance Deadline06:00 GST audit
Technician in cold weather gear working on industrial refrigeration coils in a sub-zero warehouse at 3 AM
The Response

Emergency crew mobilized from Al Quoz depot in 22 minutes. Pneumatic ice-breakers cleared coil bridges without thermal shock. Secondary de-icing pass restored full airflow. System back online before dawn.

Mobilization Time22 minutes
EquipmentPneumatic Breakers × 6, Infrared Array
Crew12 technicians, 1 site engineer
Stock Preserved100% — zero loss
Industrial refrigeration coils showing restored airflow after emergency ice removal
Thermal Scan — Post Clearance
22 min

Crew on-site from first call

Case Study No. 003Event Operations
Sunday, 06:00 GST
003
The Problem

10,000m² Ice Rink TeardownNational Day

Temporary winter installation at Dubai Design District. 10,200m² of compacted ice, 22cm average depth. Venue must be returned to bare concrete for a brand activation at 18:00. Twelve hours. No exceptions.

Total Ice Volume224 metric tonnes
Average Ice Depth22 cm
Venue Handover18:00 GST (hard deadline)
Penalty ClauseAED 800,000 if overrun
Large-scale industrial ice removal operation with multiple plows working in formation across a massive temporary ice rink
The Response

Eight-plow formation deployed in a grid pattern. Melt-water extraction running parallel. Chemical accelerant applied to perimeter zones first, working inward. Full concrete inspection signed off at 17:41.

Equipment8× P-Series Plows, 3× Melt Extractors
Crew24 technicians, 2 supervisors
Ice Removed224 tonnes in 11h 41m
Handover17:41 GST — 19 min early
Aerial view of completed ice removal showing clean concrete surface ready for next event
Thermal Scan — Post Clearance
224t

Ice removed — 19 minutes ahead of deadline

ServicesFull Capability Matrix
SVC-013,800 m²/night

Slope Resurfacing

Overnight and scheduled resurfacing for indoor ski slopes. Competition-standard finish guaranteed.

SVC-02≤60 min response

Cold-Chain Emergency

Sub-zero facility ice removal. Evaporator coil clearing. 60-minute response SLA.

SVC-03224t cleared/day

Temporary Installation

Full teardown of temporary ice rinks and snow environments. Venue-ready concrete guaranteed.

SVC-04Zero surface damage

Chemical De-icing

Proprietary CR-7 compound application. Food-safe, structural-safe, surface-specific formulations.

EngagementSite Assessment & SLA Documentation
Primary Path

Request a
Site Assessment.

A Clearance operations engineer will visit your facility, assess ice accumulation risk, and deliver a response protocol within 48 hours. No obligation.

Secondary Path

Download Our
Emergency Response SLA.

The full Clearance Emergency Response Service Level Agreement — response time guarantees, crew deployment protocols, equipment specifications, and penalty clauses. Filed by operations managers across Dubai's cold infrastructure.

Response Guarantee≤ 60 minutes, any time
Coverage ZoneAll Dubai + Jebel Ali FZ
Crew Minimum6 certified technicians
Equipment Standby2× plows pre-positioned
Penalty StructureDefined & enforceable

Trusted by

Ski DubaiMall of the EmiratesJebel Ali FZDP WorldEmaar Hospitality
Clearance UAE24/7 Emergency Response — Dubai & Jebel Ali